Site evaluation

Home Battery Rebate Form

Use this form after your initial enquiry so we can assess your property, prepare a more accurate system recommendation, and give the installer the details they need before booking work.

Confirm System Fit

We review your existing solar, switchboard, battery location, internet access, backup needs, and site constraints.

Prepare The Quote

Your answers help us avoid guesswork around installation requirements, rebate eligibility, equipment choice, and possible extra works.

Help The Installer

The information can be shared with the installation team so they arrive with clearer expectations and fewer surprises.

Before You Start

The form is easiest to complete if you have a recent electricity bill, photos of your switchboard, photos of your inverter area, and a rough idea of where you would like the battery installed.

  • Photos from a phone are fine.
  • If you are unsure about an answer, leave a note rather than guessing.
  • We use this information only to assess your system and installation requirements.

Property Information Form

Home Battery and Solar – Installation Form

Customer and property details

This gives us the basic contact and installation address details we need before assessing the system.

System interest and goals

Tell us what you are considering. It is fine if you are not sure yet.

Existing solar and battery

These answers help us work out compatibility, upgrade paths, and whether extra equipment may be needed.

Electrical and site details

These details help us prepare a cleaner quote and avoid installation surprises.

Battery location and photos

Photos are the most useful part of this form. They help us check practical battery location, switchboard space, access, cable route, and likely extra works.

Quick location guide

Good locations: garage, utility area, shaded external wall, or another solid wall close to the switchboard/inverter.

Avoid where possible: bedrooms, living areas, direct sun, gas bottles, hot-water units, AC condensers, taps/hoses, tight walkways, and areas with poor access.

Final compliance: the installer will confirm the final location against the relevant Australian standards and product requirements.

Photos to upload

  • Switchboard close-up with the door open and breakers visible.
  • Switchboard wide shot showing the surrounding wall/area.
  • Existing inverter and solar equipment if installed.
  • Preferred battery location from close-up and 3-5 m back.
  • Access path from driveway/gate to the work area.
  • Other side of the proposed battery wall if accessible.
X