Description
4 x EVE MB30 306AH 3.2v LFP A+ AUTOMOTIVE GRADE
This next generation EVE 306ah 3.2v Prismatic LFP cell, has been verified by EVE Laboratory to be able to hit 10,000 cycles, this is due to new novel manufacturing technology, the secret sauce of LFP chemistry has gone through multiple iterations, the quality of the Cathode and Anode materials has been improved, and it is now expected that under the right conditions, these cells can reach a lifetime of up to 20+ years.
MB30
- Model Name: MB30
- Nominal Capacity: 306Ah
-
REAL MEASURED CAPACITY : 330+AH
- Nominal Voltage: 3.2V
- Standard Charge/ Discharge: 0.5C / 0.5C
- Cycle Life: 10000 Cycles
- MSDS, IEC 62619, UN38.4
- Data Sources: EVE’s Laboratory
Specification Parameters | |
---|---|
Nominal Capacity | 306Ah |
Nominal Voltage | 3.2V |
Initial IR | 0.18 mΩ ±0.05 mΩ |
Weight | 5600g ±300g |
Charging Cut-off Voltage | 3.65V |
Discharging Cut-off V oltage | 2.5 V T >0℃ 2.0 V T ≤0℃ |
Discharging Temperature | – 30~60℃ |
Storage Temperature | 0~35℃ |
Model Name | MB30 |
Cycle Life | 10000 |
Standard Charging Power | 0.5P |
Standard Discharging Power | 0.5P |
Height(H) with terminal | 207.2 mm ±0.5 mm |
Height(h) without terminal | 204.6 mm ±0.5 mm |
Length | 173.7 mm ±0.5 mm |
Thickness | 71.7 mm ±0.8 mm |
We advise following all required safety standards such as the following:
- AS/NZS 5033, Installation and safety requirements for photovoltaic (PV) arrays
- AS/NZS 4509.1, Stand-alone power systems, Part 1: Safety and installation
- AS 4086.2, Secondary batteries for use with stand-alone power systems, Part 2: Installation and maintenance
- AS/NZS 3000, Wiring Rules
- AS/NZS 1768, Lightning protection
- AS 4777, Grid connection of energy systems via inverters.
Road vehicles are required to meet the Australian Design Rules (ADRs) in accordance with the Motor Vehicles Standards Act 1989. The recently published draft of ADR109/00 Electric Power Train Safety Requirements, related to Class M (passenger vehicles) and N (goods vehicles < 3.5 t, e.g., van or ute). ADRs are performance-based, and draft ADR109/00 draws from, and directly recognises as being equivalent to UN100/R03 and includes specific performance and abuse tests performed on the vehicle itself but does not mandate the use of batteries complying with any particular standard.
As nominated explicitly in SAE J2464, the tests described by many of the standards listed in Table 5 may be conducted on cells, batteries, or products without active protection mechanisms. Taking this approach can provide a method to determine safety levels and integrity levels required for functional safety analysis.
EVE OFFICIAL INSTRUCTIONS FOR SAFE USE OF BATTERIES
NEXT DELIVERY END OF MIDDLE TO END OF AUGUST 2024
First and Second and Third ALLOCATION EXHAUSTED – SOLD OUT- Next EVE production ready date is in July.
New Model for Q2 2024. First stock arrives start of Q2 2024. Real Capacity is over 330AH
IMPORTANT SHIPPING INFORMATION
PRE ORDER VS SAME DAY SHIPPING
- PRE-ORDER is pre payment, and it means you can secure a LARGE discount there are a few reasons we can do this.
- Shipping Costs from EVE to Hervey Bay is rather expensive
- If we can collate a large number of orders together, we can secure better shipping costs directly from EVE factory to your delivery address.
- If we can accurately order the right quantity of cells from EVE, the entire process is more efficient and also lowers the cost.
SAME DAY SHIPPING – Orders from stock means we need to pay the expensive Dangerous Goods shipping a second time to your address. This and the cost of holding the stock in storage and business related expenses add up quickly. We always prefer to get our customers the best value for money.
Process > Quality of cells. Directly purchased from EVE, with testing data > moved to our warehouse for packing into boxes of 4 or aseembly into our range of batteries. We can then negotiate with shipping companies to deliver the goods at the best rates available for DG.
SAME DAY means we ship it from our stock in Hervey Bay to you the same day. We call the courier after you make the order. You should receive the goods within a few days to all EAST COAST locations.
STOCK INFORMATION
SOLD OUT – NEXT DELIVERY DATE IS NOT AVAILABLE. NO STOCK IS AVAILABLE TO PURCHASE FROM EVE (10/07/24)
New Model for Q2 2024. First stock arrives start of Q2 2024. Real Capacity is over 330AH